Metal Roof Rake Trim Installation

The trick here is to slide the continuous cleat into the hem of the trim piece.
Metal roof rake trim installation. Do not place screws 12 from the ridge of the roof until ridge cap is installed. Step by step instructions for installation of gable and rake trim on an exposed fastener panel. It is cut angled and folded onto the roof line and fasteners usually evenly spaced between 12 and 24 inches apart set it in place. Resulting in a uniform edge rake trim terminates the roof panel at the end of the roof to the gable end wall panel gieseke says.
It helps direct water away from the. It is extremely important that this panel be laid square to the eave and ridge so that the remaining panels will line up square on the roof frame. Make a mark at the crease line and do the same thing towards the peak of the roof. Additional screws should be placed 12 on face staggered from top screws.
Put it against the roof and let it stick out by about an inch. At this point chalk a line from ridge to eave. Bend the flashing into a v shape to fit over the top roof ridge and the corners where the panels meet. Place the leading edge of the first panel along this line.
The flashing should overlap the edge of the roof by one inch to help direct. Rake trim can be flat with no overhang or it can overhang the gable end like an eave. Applicable for ultravic supervic 7 8 corrugated barnmaster. Measure one panel width in from the roof edge.
Here we have the concealed fastener rake or gable trim and we ll install this with a continuous cleat. Flashing is metal trim that fits over joints where two sections of roof meet. Fasten gable trim with x inch metal to metal lap screws.