Meter Pole Installation Cost
1 weather proof panel with breakers.
Meter pole installation cost. This unit is ansi certified and ul listed with a maximum 10 000 air. If you are a homeowner. Weather head must be a minimum of 18 inches from top of the pole. If this is for electric meter set it is not necessary if the main breakers are off.
Contact our customer service department here or call 1 800 342 6978 for additional details. If you are a home builder. 2 unit costs include costs to procure materials installation engineering project management costs for majority of scenarios 3 unit costs exclude generator s responsibility for income tax component of contribution itcc will be added to total cost estimates if required 4 unit costs exclude environmental monitoring and mitigations. If you are a multi unit apartment builder.
For larger electrical jobs like installing wiring or replacing an electrical panel expect to pay 2 000 to 6 000. The trench has to be 24 inches deep for secondary and a minimum of 30 inches deep for primary services. Call centerpoint energy at 713 207 2222 to have an electric service identifier esi id number created. 1 4x6 post braced with 2x4s with at least 12ft to knob a 16 ft post.
The square d 125 amp 16 space 24 circuit outdoor the square d 125 amp 16 space 24 circuit outdoor combination meter socket and main breaker load center is suitable for use as a combination service entrance device csed. All permits required to receive service are the responsibility of the member. Electrical work repair costs. Then you have to pull a permit 60 get a licensed electrician to install it 100 and have it signed off by a city county inspector.
Get free estimates from electricians near you or check out our pricing guide. The average cost of an overhead installation is 1 200 including labor materials connecting the wire from the transformer to the weatherhead meter 1 installation and inspection of site location and pole. The average cost of an underground installation is 800 including materials meter 1 installation and connecting service to the splice box. See below for our assembly guide for meter pole installation.
Submit your request for an esi id nu mber here. 1 1 1. Then there is the cost to the electrician to build it and install it. The pole must be treated and be at least a class 7 round or 6 x 6 square and have a minimum of 14 5 feet above the ground.
If metallic weather head is used with pvc conduit it must have a bonding ground. The combination service entrance device features a ring type meter cover with a single phase 4 jaw meter.