Mineral Roll Roofing Installation

How to do it attach first course.
Mineral roll roofing installation. To seal a plumbing vent spread roofing. Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a. Place a 9 229 mm wide starter strip along eave and rake edges so it overhangs the drip edge 1 4 6 3 mm. Plan so that no two butt joints are closer than 2 feet from each other.
Mineral guard roll roofing can be installed following either the horizontal method parallel to the eaves or the vertical method parallel to the rakes. Fasten the strips with rows of nails located 1 and 8 from the roof edge and spaced 4 on center in each row.